The River Yealm Hotel, Newton Ferrers
BackGroundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.
Works included:
- Demolition of extensions and internal soft strip out of Hotel;
- Identification and licenced disposal of Asbestos containing materials;
- Installation of all new services and utilities including connections into mains services within adjacent road;
- Slope re-profiling, installation of rock netting, rock pinning and soil nailing for slope stabilisation;
- Construction of gabion cage/basket retaining walls;
- Installation of Tensar green slope geotextile stabilisation system to provide a car deck;
- Landscaping.
Project value between £750k – £1m