Case Study The River Yealm Hotel, Newton Ferrers

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses.

Works included:

  • Demolition of extensions and internal soft strip out of Hotel;
  • Identification and licenced disposal of Asbestos containing materials;
  • Installation of all new services and utilities including connections into mains services within adjacent road;
  • Slope re-profiling, installation of rock netting, rock pinning and soil nailing for slope stabilisation;
  • Construction of gabion cage/basket retaining walls;
  • Installation of Tensar green slope geotextile stabilisation system to provide a car deck;
  • Landscaping.

 

Project value between £750k – £1m


Related case studies

Quince Honey Farm – South Molton

JCT Design & Build 2016 groundworks and buildings package for the new Quince Honey Farm tourist attraction (www.quincehoneyfarm.co.uk) Works included: Site remediation and stabilisation; Excavation and installation of foundations pits and setting building bolts; Surface water attenuation ponds and drainage runs; Foul drainage runs and treatment tank; Electical, BT and gas ducting installation; Reinforced concrete… Read more »

Refresco, Kegworth

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur ut viverra neque, in hendrerit nulla. Morbi eget nunc a mi placerat dictum. Curabitur nec ipsum sit amet nisl dignissim consectetur nec vel augue.

Rathfinny Wine Estate, Polegate

What was it? JCT Design & Build 2016 groundworks package for a wine processing plant and wine storage building. Works included: Diversion of existing services and utilities; Bulk excavations and cut and fill; Construction of reinforced retaining walls (140 linear metres); Installation of new services and utilities including aqua storm ply cells and directional drilling for… Read more »

The Horse Trust, Speen

Groundworks package for the erection of a Indoor Riding School, Isolation Unit and Archive / Office building at the Horse Trust. Works included: Cut and fill for new riding school building; Foundation pits inc. setting building bolts; Reinforced concrete floor slabs with powerfloat finish; Reinforced concrete yard areas with brushed finish; Surface water attenuation and… Read more »