Budget

£500,000

Labour

7 site workers, 2 surveyors

Machines

3 diggers, 4 dumpers

Experienced icon
Total time taken

254 hours


What was it?

JCT Design & Build 2016 groundworks package for a wine processing plant and wine storage building.

Works included:

  • Diversion of existing services and utilities;
  • Bulk excavations and cut and fill;
  • Construction of reinforced retaining walls (140 linear metres);
  • Installation of new services and utilities including aqua storm ply cells and directional drilling for storm outfall pipes;
  • Supply and lay of approx. 5,000 sqm of 150mm reinforced concrete slabs to a power float finish;
  • Supply and install internal stainless steel drainage with food grade resin flooring;
  • Landscaping chalk bund areas;
  • Liaising with principal contractor and providing design solutions.

Project value: between £1.5m – £2m


Related case studies

Refresco, Kegworth

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Curabitur ut viverra neque, in hendrerit nulla. Morbi eget nunc a mi placerat dictum. Curabitur nec ipsum sit amet nisl dignissim consectetur nec vel augue.

The Horse Trust, Speen

Groundworks package for the erection of a Indoor Riding School, Isolation Unit and Archive / Office building at the Horse Trust. Works included: Cut and fill for new riding school building; Foundation pits inc. setting building bolts; Reinforced concrete floor slabs with powerfloat finish; Reinforced concrete yard areas with brushed finish; Surface water attenuation and… Read more »

Quince Honey Farm – South Molton

JCT Design & Build 2016 groundworks and buildings package for the new Quince Honey Farm tourist attraction (www.quincehoneyfarm.co.uk) Works included: Site remediation and stabilisation; Excavation and installation of foundations pits and setting building bolts; Surface water attenuation ponds and drainage runs; Foul drainage runs and treatment tank; Electical, BT and gas ducting installation; Reinforced concrete… Read more »

The River Yealm Hotel, Newton Ferrers

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses. Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »