Nam et tellus vel felis fringilla scelerisque vel ac ante. Morbi eros dui, scelerisque sit amet nunc eu, gravida cursus ligula. Cras suscipit mi in mi viverra tristique. Curabitur in mi erat. In consectetur justo nec magna pharetra fringilla. Aenean risus enim, mattis id magna quis, pretium convallis nisi.


JCT Design & Build 2016 groundworks package for two drinks storage buildings.

Works included:

  • Demolition of existing storage tents;
  • Site preparation for 2 nr 10,000 sqm storage buildings including lime stabilisation;
  • Surface water attenuation, deep drainage and manholes installation;
  • Foul water drainage installation;
  • CFA piles and reinforced pilecaps;
  • Dock leveller pits and in-situ retaining walls;
  • Floor slabs to powerfloat finish;
  • External yard concrete to brushed finish;
  • External HGV tarmac road access.
  • Full structural, geotechnical, highways and drainage engineer design package.

Project value between £5m – £6m


Related case studies

Rathfinny Wine Estate, Polegate

What was it? JCT Design & Build 2016 groundworks package for a wine processing plant and wine storage building. Works included: Diversion of existing services and utilities; Bulk excavations and cut and fill; Construction of reinforced retaining walls (140 linear metres); Installation of new services and utilities including aqua storm ply cells and directional drilling for… Read more »

The Horse Trust, Speen

Groundworks package for the erection of a Indoor Riding School, Isolation Unit and Archive / Office building at the Horse Trust. Works included: Cut and fill for new riding school building; Foundation pits inc. setting building bolts; Reinforced concrete floor slabs with powerfloat finish; Reinforced concrete yard areas with brushed finish; Surface water attenuation and… Read more »

The River Yealm Hotel, Newton Ferrers

Groundworks package for a residential development scheme comprising the refurbishment of an existing riverfront Hotel and luxury new build apartments and houses. Works included: Demolition of extensions and internal soft strip out of Hotel; Identification and licenced disposal of Asbestos containing materials; Installation of all new services and utilities including connections into mains services within adjacent… Read more »

Quince Honey Farm – South Molton

JCT Design & Build 2016 groundworks and buildings package for the new Quince Honey Farm tourist attraction (www.quincehoneyfarm.co.uk) Works included: Site remediation and stabilisation; Excavation and installation of foundations pits and setting building bolts; Surface water attenuation ponds and drainage runs; Foul drainage runs and treatment tank; Electical, BT and gas ducting installation; Reinforced concrete… Read more »