Groundworks package for the erection of a Indoor Riding School, Isolation Unit and Archive / Office building at the Horse Trust.

Works included:

  • Cut and fill for new riding school building;
  • Foundation pits inc. setting building bolts;
  • Reinforced concrete floor slabs with powerfloat finish;
  • Reinforced concrete yard areas with brushed finish;
  • Surface water attenuation and drainage runs;
  • Foul drainage runs and treatment tank;
  • Electical ducting installation inc. moleing;
  • Construction of a new menage and sand rest areas;

Project value between £750k – £1m